Santos - Well Appraisal / Flowback Skid Scope of Work GRPS worked in a fully integrated manner with the client team to ensure this product met the strict technical specifications required. System design to customer requirements/ standards and to suit installation requirements Pressure rated to suit installation Designed to be installed, commissioned and ready for operation in under two (2) days Designed to be demobilised and removed from site in under two days Designed for remote monitoring (including security camera) regardless of location Installation method developed to minimise technical requirement on site Fail safe ADDED VALUE Reduced design and development cost and time with remote access to real-time measurement data SUMMARY CLIENT SANTOS LOCATION South West Queensland Back