Scope of Work
GRPS worked in a fully integrated manner with the client team to ensure this product met the strict technical specifications required.
- System design to customer requirements/ standards and to suit installation requirements
- Pressure rated to suit installation
- Designed to be installed, commissioned and ready for operation in under two (2) days
- Designed to be demobilised and removed from site in under two days
- Designed for remote monitoring (including security camera) regardless of location
- Installation method developed to minimise technical requirement on site
- Fail safe
ADDED VALUE
Reduced design and development cost and time with remote access to real-time measurement data